|
Stages
of a restoration: 3. Re-build
 |
Frame
wise, the only parts salvagable from the forks were the bottom sliders.
Even the head bearings were shot. The swinging arm bearings had to
be cut out!
|
 |
We
threw the rear suspension units away as well - surprise! The petrol
tank was from a pre unit, and mounted on walking stick rubbers!
Rear mudguard was from a 5 speed machine, so too was the rear
grab rail and seat, not right at all. Foot rests were of two different
lengths! |
 |
Almost
finished, by the way the client requested twin leading shoe front
hook for road use but will put in original brake for shows. An original
chain case is yet to be sourced.
Stage
4
|
|